ECI-SRV-02
Infrastructure architecture and deployment
We design and deploy complete infrastructure foundations, from hardware sizing through to go-live. Every platform is delivered documented, tested under failure conditions and handed over to the operations team, with no dependency on our continued presence.
Scope of work
- Hardware sizing, selection of servers, storage and network equipment.
- Design of the target architecture: compute, storage, network, security.
- Installation and configuration of virtualisation and cloud platforms.
- Integration with the existing estate: directory, backup, monitoring, network.
- Technical acceptance, cutover testing and go-live.
Deliverables
- A technical architecture file and infrastructure diagrams.
- A platform installed, configured and accepted.
- An executed acceptance test book and a commissioning record.
- Operating procedures and recovery documentation.
Technologies
- Virtualisation: Proxmox VE, Nutanix AHV, Hyper-V, KVM.
- Private cloud: community OpenStack and Red Hat OpenStack Services on OpenShift.
- Servers and storage: Lenovo and Red Hat manufacturer partnerships.
Engagement terms
Ten to forty days depending on the size of the platform, fixed price or supervised time and materials.
How the engagement runs
Phase 1 — Design
- Architecture workshops and validation of the sizing.
- Technical architecture file and deployment plan.
Phase 2 — Preparation
- Preparation of network, storage and prerequisites.
- Pre-production environment and validation of the design choices.
Phase 3 — Deployment
- Installation, configuration and integration with the existing estate.
- Hardening, backup and connection to monitoring.
Phase 4 — Acceptance and handover
- Execution of the acceptance test book and failure testing.
- Transfer of skills and handover of the documentation.
What every engagement includes
- A detailed quote, issued after framing
- A named project manager
- Operating documentation delivered
- Transfer of skills to your teams
- Work carried out on site or remotely
- Support after go-live
No work in production without a written rollback plan.
Request a framing session
Or contact us directly:
In the same area
Let us talk about your situation
Every engagement begins with a framing exercise and a detailed quote.
Book an appointment